Dates formula

Weeks Between Two Dates

Weeks are the most regular unit on the calendar: every one has seven days, whatever the month or year. That makes a count in weeks easy to work out and easy to check against a weekday, which is one reason notice, probation and training periods are so often written in weeks.

Formula

whole weeks = (end date − start date) ÷ 7, rounded down; leftover days = (end date − start date) − 7 × whole weeks (the start day is not counted; add 1 to the day count first if both ends should count)

end date − start date
the number of days from the start date to the end date, not counting the start date
whole weeks
the number of complete seven-day blocks in that day count
leftover days
the remainder once the whole weeks are removed, always from 0 to 6
decimal weeks
the day count ÷ 7 without rounding, for example 27.29
weekday
the day of the week, which is the same for any two dates a whole number of weeks apart

Date Difference Calculator

What it means

A week is the only calendar unit above the day with a fixed length, so this calculation needs none of the conventions that months and years depend on. Find the days from one date to the other, divide by 7, and write the quotient as weeks and the remainder as days. Leap years and long months change the day count you start from, and nothing after that.

The weekday gives a free check. Two dates an exact number of weeks apart fall on the same day of the week, so if a period starts on a Monday and the remainder is 2, the end date must be a Wednesday. If your answer and the calendar disagree, the day count is wrong, most often because a month length or a leap day was missed.

Counting both ends shifts the result by one day, and with weeks that shift is easy to see. A Monday to the Sunday six days later is 6 days by subtraction, which is 0 weeks and 6 days, yet it is one full week if both dates are counted. A period of whole weeks that includes its first day therefore ends the day before the matching weekday: twelve weeks beginning on a Monday finish on a Sunday. Whether a period "of twelve weeks" runs that way, or starts the day after an event, is set by the contract or policy concerned.

Take care when moving between weeks and larger units. A year is 52 weeks and 1 day, or 52 weeks and 2 days in a leap year, and an average month is about 4.35 weeks, not 4. Thirteen weeks is only roughly a quarter of a year, and "four weeks" and "one month" name different periods in every month except a 28-day February. If a document gives a period in months, do not convert it to weeks to do the sum.

Other forms

Decimal weeks
decimal weeks = (end date − start date) ÷ 7
Days from weeks and leftover days
days = 7 × whole weeks + leftover days
End date from a start date and a number of weeks
end date = start date + 7 × weeks
Last day of a period of whole weeks that includes its first day
last day = first day + 7 × weeks − 1

Worked example

You started a new job on Monday 2 March 2026, and your probation review meeting is booked for Wednesday 9 September 2026. You want to know how many weeks into the job that is.

  1. Rest of March: 31 − 2 = 29 days
  2. Complete months: April 30 + May 31 + June 30 + July 31 + August 31 = 153 days
  3. Days in September up to the meeting: 9
  4. Days from the first day to the meeting: 29 + 153 + 9 = 191
  5. Whole weeks: 191 ÷ 7 = 27, because 27 × 7 = 189
  6. Leftover days: 191 − 189 = 2, and Monday plus 2 days is Wednesday, which matches the calendar
  7. As a decimal: 191 ÷ 7 = 27.29 weeks

Result: The review falls 27 weeks and 2 days after your first day, or about 27.29 weeks. Twenty-six weeks from the same start is Monday 31 August, while six calendar months is 2 September, so the two wordings do not name the same date.

Where it is used

Your contract asks for twelve weeks of notice and you hand in your resignation on Monday 2 November 2026. Twelve weeks is 12 × 7 = 84 days. If the notice period includes the day you resign, it runs from 2 November to Sunday 24 January 2027; if it starts the following day, it runs from 3 November to Monday 25 January 2027. The Notice Period Calculator shows both versions. One day matters when a new employer is waiting for a start date, and which version applies depends on your contract, so ask your current employer to confirm the last day in writing before you promise anything.

Common mistakes

  • Reading a decimal as days: 27.5 weeks is 27 weeks and 3.5 days, not 27 weeks and 5 days.
  • Treating a month as four weeks, which loses two or three days in most months and about four weeks over a year.
  • Counting the calendar weeks that a period touches instead of the seven-day blocks it contains, so that a Friday to the following Monday is called two weeks when it is 3 days.
  • Expecting a period of whole weeks that includes its first day to end on the same weekday, when it ends on the weekday before.
  • Dividing an inclusive day count by 7 for one period and a plain difference for another, then comparing the two results as if they were measured in the same way.

Questions and answers

How many weeks are there in a year?

Fifty-two weeks and one day in a normal year, and fifty-two weeks and two days in a leap year. That extra day is why a given date falls one weekday later each year, or two after a leap day. It is also why some years contain 53 of a particular weekday.

Is four weeks the same as one month?

Only in a February of 28 days. Every other month has 29, 30 or 31 days, so four weeks falls one to three days short. Over a year there are thirteen four-week periods against twelve months, which is why pay or notice quoted in weeks cannot simply be swapped for months.

Should I give the answer in weeks and days or as a decimal?

Weeks and days is clearer for people, because it can be checked against a calendar. A decimal suits further arithmetic, such as multiplying by weekly pay or weekly hours. If you quote a decimal, say how many places you rounded to.

Does it matter which day of the week the period starts on?

Not for the number of weeks: a week here is any seven consecutive days, not Monday to Sunday. It matters only if a document defines a week as a calendar week or a pay week. In that case, count the named weeks the document refers to instead of dividing by 7.